﻿{"id":1404533,"date":"2018-11-26T17:49:13","date_gmt":"2018-11-26T14:49:13","guid":{"rendered":"http:\/\/www.erzurumflas.com\/boluda-gesten-1-milyon-4-bin-800-kilovatsaat-elektrik-uretildi\/"},"modified":"2018-11-26T17:49:21","modified_gmt":"2018-11-26T14:49:21","slug":"boluda-gesten-1-milyon-4-bin-800-kilovatsaat-elektrik-uretildi","status":"publish","type":"post","link":"https:\/\/www.erzhaber.com.tr\/?p=1404533","title":{"rendered":"Bolu\u2019da, GES\u2019ten 1 milyon 4 bin 800 kilovatsaat elektrik \u00fcretildi"},"content":{"rendered":"<p><img decoding=\"async\" src=\"http:\/\/www.erzurumflas.com\/wp-content\/uploads\/2018\/11\/boluda-gesten-1-milyon-4-bin-800-kilovatsaat-elektrik-uretildi_f10e8fc.jpg\" width=\"600\">Bolu\u2019da, 19 bin 500 metrekarelik alana kurulan 4 bin panelli G\u00fcne\u015f Enerji Santrali\u2019nden 8 ayda 1 milyon 4 bin 800 kilovatsaat elektrik \u00fcretildi.<\/p>\n<p>Bolu\u2019da, ge\u00e7ti\u011fimiz y\u0131l Kas\u0131m ay\u0131nda Sar\u0131calar \u0130\u00e7me Suyu Ar\u0131tma Tesisi arazisinde yap\u0131m\u0131na ba\u015flanan ve 15 Nisan\u2019da faaliyete ge\u00e7en 4 bin panelli G\u00fcne\u015f Enerji Santrali, enerji \u00fcretimini s\u00fcrd\u00fcr\u00fcyor.<\/p>\n<p>Ayl\u0131k 10 bin hanenin kulland\u0131\u011f\u0131 enerjiye e\u015fde\u011fer enerji \u00fcretilecek olan santralde y\u0131ll\u0131k yakla\u015f\u0131k 1 milyon 300 bin kilovatsaat enerji \u00fcretilmesi hedefleniyor. Proje kapsam\u0131nda, 4 bin panelli G\u00fcne\u015f Enerji Santrali\u2019nden ilk 8 ayda 1 milyon 4 bin 800 kilovatsaat elektrik \u00fcretimi sa\u011fland\u0131.<\/p>\n<p>GES\u2019ten sa\u011flanan enerjinin y\u0131ll\u0131k 200 bin kilovatsaati Bolu Belediyesi Sar\u0131calar Temiz Su Ar\u0131tma Tesisi\u2019nin enerji ihtiyac\u0131n\u0131nda kullan\u0131lacak. Geri kalan\u0131 enerjinin ise, Sakarya Elektrik Da\u011f\u0131t\u0131m A\u015e\u2019ye sat\u0131larak ekonomiye katk\u0131 sa\u011flanaca\u011f\u0131 \u00f6\u011frenildi.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BOLU\u2019DA, 19 B\u0130N 500 METREKAREL\u0130K ALANA KURULAN 4 B\u0130N PANELL\u0130 G\u00dcNE\u015e ENERJ\u0130 SANTRAL\u0130\u2019NDEN 8 AYDA 1 M\u0130LYON 4 B\u0130N 800 K\u0130LOVATSAAT ELEKTR\u0130K \u00dcRET\u0130LD\u0130.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18],"tags":[17719,12970,13587,3076,98625,111382,10636,27239],"class_list":["post-1404533","post","type-post","status-publish","format-standard","hentry","category-bilim-teknoloji","tag-17719","tag-bin","tag-boluda","tag-elektrik","tag-gesten","tag-kilovatsaat","tag-milyon","tag-uretildi"],"_links":{"self":[{"href":"https:\/\/www.erzhaber.com.tr\/index.php?rest_route=\/wp\/v2\/posts\/1404533","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.erzhaber.com.tr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.erzhaber.com.tr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.erzhaber.com.tr\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.erzhaber.com.tr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1404533"}],"version-history":[{"count":0,"href":"https:\/\/www.erzhaber.com.tr\/index.php?rest_route=\/wp\/v2\/posts\/1404533\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.erzhaber.com.tr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1404533"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.erzhaber.com.tr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1404533"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.erzhaber.com.tr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1404533"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}